โ˜…โ˜…โ˜…โ˜…โ˜… 4.9/5 Rated
๐Ÿ›ก๏ธ 10-Year Guarantee
๐Ÿšš Free UK Delivery
๐Ÿ“ 20,000+ Mattresses Since 1985
Need help? I'm here to help you find the perfect fit. ๐Ÿ“ž 0121 663 6114 ๐Ÿ’ฌ WhatsApp 07769 431 970
Size & Shape
Mattress
3
Order
Skip to product information
1 of 4

SKU:BodyK109

Bodyshape Right S Curve Boat Mattress - King

Bodyshape Right S Curve Boat Mattress - King

Regular price ยฃ439.00 GBP
Regular price Sale price ยฃ439.00 GBP
Sale Sold out
Choose Mattress Thickness
Choose Mattress Firmness
Choose How to Provide Measurements
๐Ÿ“ Enter Your Measurements Now
  1. Enter precise measurements in your preferred unit
  2. After entering your measurements, scroll down the page and click 'Add to cart' to continue.
Quick measuring reference

Quick measuring reference - click above for detailed guide

Vehicle Details (Optional but helpful)

๐Ÿ“ง I'll Email My Measurements After Ordering

No problem โ€” send your measurements after ordering. Email or WhatsApp them to 07769 431 970 with your order number and we'll take care of the rest.

๐Ÿ“ฆ Prefer to Trace Your Mattress? Request a Free Template Kit

We'll post you a free measuring kit โ€” craft paper, marker and prepaid return envelope. Simply trace your mattress shape and post it back.

Arrives within 1โ€“2 working days ยท Completely free ยท No payment required

Quantity

Our Promise to You

Built to Last

Up to 10-year guarantee - quality materials last decades, not months

Handcrafted in Britain

Made in our UK workshop - not mass-produced overseas

Free UK Delivery

Complimentary delivery - upgrading should be effortless

Perfect Custom Fit

Made specifically for your boat - no gaps or poor fitting

Our customers say Excellent โ˜…โ˜…โ˜…โ˜…โ˜…
4.9 out of 5 based on 100s of reviews across multiple review platforms
View full details

Bodyshapeโ„ข Mattress

Premium Vascoโ„ข50 memory foam for personalised pressure relief and superior motion isolation

Bodyshapeโ„ข Mattress
  • 3 firmness levels: Medium, Firm Orthopaedic, Hard
  • Depths from 15โ€“25 cm
  • 5-year guarantee
  • TENCELยฎ zip-off washable cover
  • Premium Vascoโ„ข50 memory foam
  • Triple-layer construction
  • Lightweight design
  • Excellent motion isolation for couples

Triple-Layer Construction
Bodyshapeโ„ข triple-layer construction diagram
  1. TENCELยฎ Zip-Off Cover

    Superior moisture-wicking and temperature regulation. Easy to remove and machine wash.

  2. Vascoโ„ข50 Memory Foam Top Layer

    Moulds to your body shape for personalised pressure relief and motion isolation.

  3. Adaptive Support Layer

    Responds to movement whilst maintaining proper spinal alignment. Bridges the comfort layer with the foundation.

  4. Premium Foundation Layer

    Provides stability and durability in a lightweight construction.

Why Choose Bodyshapeโ„ข?

The Bodyshapeโ„ข features Vascoโ„ข50 memory foam that moulds to your body shape for targeted pressure relief โ€” a significant step up from the budget memory foams used by many competitors.

Its triple-layer construction delivers excellent motion isolation, making it ideal for couples, whilst adapting to your individual sleep needs.

Ideal for:

  • Couples wanting minimal sleep disturbance
  • Those with pressure points needing targeted relief
  • Side sleepers seeking body-contouring support
  • Anyone requiring orthopaedic support with comfort
Firmness & Depth Options

Firmness Levels

Medium

Personalised contouring with balanced support

Firm Orthopaedic

Enhanced spinal alignment and therapeutic support

Hard

Maximum support with targeted pressure relief

Available Depths

15 cm

Compact comfort for tighter spaces. Supports up to 15 stone (95 kg).

20 cm

Optimal balance of contouring and support. Supports up to 20 stone (127 kg).

25 cm

Maximum luxury and pressure relief. Supports up to 25 stone (159 kg).

All depths available in Medium, Firm Orthopaedic, and Hard. For weights above 25 stone, please contact us for bespoke options.

Care & Maintenance

Mattress

  • No-flip design โ€” one-sided use with a marked sleeping surface
  • Rotate head-to-foot periodically for even wear
  • Allow ventilation; use a mattress protector
  • No special maintenance required for the foam layers

TENCELยฎ Cover

  • Machine wash at 30 ยฐC on a gentle cycle
  • Use mild liquid detergent โ€” no bleach
  • Air dry only
  • Iron on low if needed
  • Wash every 1โ€“2 months
Measuring Guide

We always recommend reducing your order size by a couple of centimetres to allow room for tucking in bedding, though this remains a personal preference.

Delivery
  • Free delivery to most addresses in England, Scotland, and Wales
  • Rolled and vacuum-packed in a 158 ร— 39 ร— 39 cm box for easy handling
  • Lead time typically 7โ€“14 days depending on demand and production capacity

Specific mattress weights are available on request.

Frequently Asked Questions
How does Vascoโ„ข50 memory foam work?
It uses your body heat to mould to your shape, providing personalised support that standard budget foams cannot match.
How good is the motion isolation?
Excellent โ€” the Vascoโ„ข50 construction absorbs movement so your partner won't disturb you.
How long does a rolled mattress take to expand?
2โ€“4 hours for basic expansion; allow 24โ€“48 hours for the foam to fully activate.
What's included?
The mattress with TENCELยฎ zip-off cover, care instructions, and a 5-year guarantee.
Is the Firm Orthopaedic option suitable for everyday use?
Absolutely โ€” it's designed for therapeutic support whilst remaining comfortable for all sleeping positions.

5-Year GuaranteeQuality assured, built with confidence