โ˜…โ˜…โ˜…โ˜…โ˜… 4.9/5 Rated
๐Ÿ›ก๏ธ 10-Year Guarantee
๐Ÿšš Free UK Delivery
๐Ÿ“ 20,000+ Mattresses Since 1985
Need help? I'm here to help you find the perfect fit. ๐Ÿ“ž 0121 663 6114 ๐Ÿ’ฌ WhatsApp 07769 431 970
Size & Shape
Mattress
3
Order
Skip to product information
1 of 4

SKU:ComfiSK105

Comfisan Left S Curve Boat Mattress - Super King

Comfisan Left S Curve Boat Mattress - Super King

Regular price ยฃ509.00 GBP
Regular price Sale price ยฃ509.00 GBP
Sale Sold out
Choose Mattress Thickness
Choose Mattress Firmness
Choose How to Provide Measurements
๐Ÿ“ Enter Your Measurements Now
  1. Enter precise measurements in your preferred unit
  2. After entering your measurements, scroll down the page and click 'Add to cart' to continue.
Quick measuring reference

Quick measuring reference - click above for detailed guide

Vehicle Details (Optional but helpful)

๐Ÿ“ง I'll Email My Measurements After Ordering

No problem โ€” send your measurements after ordering. Email or WhatsApp them to 07769 431 970 with your order number and we'll take care of the rest.

๐Ÿ“ฆ Prefer to Trace Your Mattress? Request a Free Template Kit

We'll post you a free measuring kit โ€” craft paper, marker and prepaid return envelope. Simply trace your mattress shape and post it back.

Arrives within 1โ€“2 working days ยท Completely free ยท No payment required

Mattress Delivery
Quantity

Our Promise to You

Built to Last

Up to 10-year guarantee - quality materials last decades, not months

Handcrafted in Britain

Made in our UK workshop - not mass-produced overseas

Free UK Delivery

Complimentary delivery - upgrading should be effortless

Perfect Custom Fit

Made specifically for your boat - no gaps or poor fitting

Our customers say Excellent โ˜…โ˜…โ˜…โ˜…โ˜…
4.9 out of 5 based on 100s of reviews across multiple review platforms
View full details

Comfisanโ„ข Mattress

Engineered orthopaedic support with Laytecโ„ข responsive comfort and express delivery

Comfisanโ„ข Mattress
  • 3 firmness levels: Medium-firm, Firm Orthopaedic, Hard
  • Depths from 15โ€“25 cm
  • 5-year guarantee
  • TENCELยฎ moisture-wicking fixed cover
  • Laytecโ„ข comfort layer โ€” rebounds faster than memory foam
  • Multi-layer orthopaedic construction
  • Lightweight, no-flip design
  • Express delivery: 7โ€“10 working days

Multi-Layer Construction
Comfisanโ„ข multi-layer construction diagram
  1. TENCELยฎ Fixed Cover

    Naturally hypoallergenic with excellent moisture-wicking and temperature regulation.

  2. Laytecโ„ข Pressure-Relieving Top Layer

    Responsive comfort that conforms to your body whilst maintaining spinal alignment. Rebounds faster than memory foam.

  3. Premium Foundation Layer

    Engineered for orthopaedic stability and long-lasting support.

Why Choose Comfisanโ„ข?

The Comfisanโ„ข combines engineered orthopaedic support with a Laytecโ„ข comfort layer that rebounds and recovers faster than memory foam, giving you responsive pressure relief without the slow-sink feeling.

Its multi-layer construction delivers excellent support whilst remaining lightweight and easy to handle, with express delivery in just 7โ€“10 working days.

Ideal for:

  • Those seeking orthopaedic support for back or joint concerns
  • Hot sleepers needing temperature regulation
  • Anyone wanting responsive comfort that doesn't sink
  • Those needing a mattress quickly with express delivery
Firmness & Depth Options

Firmness Levels

Medium-firm

Balanced orthopaedic support with gentle pressure relief

Firm Orthopaedic

Enhanced support for optimal spinal alignment

Hard

Maximum orthopaedic support for therapeutic sleep

Available Depths

15 cm

Compact orthopaedic support. Supports up to 15 stone (95 kg).

20 cm

Optimal balance of comfort and support. Supports up to 20 stone (127 kg).

25 cm

Maximum therapeutic comfort. Supports up to 25 stone (159 kg).

All depths available in Medium-firm, Firm Orthopaedic, and Hard. For weights above 25 stone, please contact us for bespoke options.

Care & Maintenance

Mattress

  • No-flip design โ€” one-sided use with a marked sleeping surface
  • Rotate head-to-foot periodically for even wear
  • Allow ventilation; use a mattress protector
  • Hypoallergenic construction resists dust mites naturally

TENCELยฎ Fixed Cover

  • Spot clean with mild detergent and water
  • Allow to air dry completely
  • Use a mattress protector for added care
  • Professional cleaning if required
Measuring Guide

We always recommend reducing your order size by a couple of centimetres to allow room for tucking in bedding, though this remains a personal preference.

Delivery
  • Free delivery to most addresses in England, Scotland, and Wales
  • Rolled & Boxed: vacuum-sealed in a 158 ร— 60 ร— 60 cm carton
  • Full Size: delivered ready to use with no compression
  • Express delivery 7โ€“10 working days, but usually ships quicker

Specific mattress weights are available on request.

Frequently Asked Questions
Why does the Comfisanโ„ข have a fixed cover?
Fixed covers provide seamless aesthetics and enhanced durability.
How long does a rolled mattress take to expand?
Around 60 minutes to a few hours for full expansion.
What's included?
The mattress with TENCELยฎ fixed cover, care instructions, and a 5-year guarantee.
Is it suitable for adjustable beds?
Yes โ€” the flexible construction adapts to adjustable base positions whilst maintaining orthopaedic support.
How fast is express delivery?
7โ€“10 working days including production and shipping, but it usually arrives sooner.

5-Year GuaranteeQuality assured, built with confidence