★★★★★ 4.9/5 Rated
🛡️ 10-Year Guarantee
🚚 Free UK Delivery
📍 20,000+ Mattresses Since 1985
Need help? I'm here to help you find the perfect fit. 📞 0121 663 6114 💬 WhatsApp 07769 431 970
Size & Shape
Mattress
3
Order
Skip to product information
1 of 3

SKU:GrandK136

Grand Crescent™ Right S Curve Luxury Boat Mattress - King

Grand Crescent™ Right S Curve Luxury Boat Mattress - King

Regular price £799.00 GBP
Regular price Sale price £799.00 GBP
Sale Sold out
Choose Mattress Thickness
Choose Mattress Firmness
Choose How to Provide Measurements
📏 Enter Your Measurements Now
  1. Enter precise measurements in your preferred unit
  2. After entering your measurements, scroll down the page and click 'Add to cart' to continue.
Quick measuring reference

Quick measuring reference - click above for detailed guide

Vehicle Details (Optional but helpful)

📧 I'll Email My Measurements After Ordering

No problem — send your measurements after ordering. Email or WhatsApp them to 07769 431 970 with your order number and we'll take care of the rest.

📦 Prefer to Trace Your Mattress? Request a Free Template Kit

We'll post you a free measuring kit — craft paper, marker and prepaid return envelope. Simply trace your mattress shape and post it back.

Arrives within 1–2 working days · Completely free · No payment required

Quantity

Our Promise to You

Built to Last

Up to 10-year guarantee - quality materials last decades, not months

Handcrafted in Britain

Made in our UK workshop - not mass-produced overseas

Free UK Delivery

Complimentary delivery - upgrading should be effortless

Perfect Custom Fit

Made specifically for your boat - no gaps or poor fitting

Our customers say Excellent ★★★★★
4.9 out of 5 based on 100s of reviews across multiple review platforms
View full details

Grand Crescent™ Mattress

Premium Vasco™60 memory foam combined with CoolGuard™ ReVo™ cool gel technology — the perfect balance of comfort and cooling

Grand Crescent™ Mattress
  • 2 firmness levels: Medium, Firm Orthopaedic
  • Depths of 20 cm and 25 cm
  • 5-year guarantee
  • CoolGuard™ zip-off cover with ReVo™ cool gel
  • Vasco™60 premium pressure-relieving memory foam
  • Laytec™ responsive support — rebounds faster than memory foam
  • ReVo™ cooling — 30x breathability vs memory foam
  • Four-layer construction
  • Lightweight design

Four-Layer Construction
Grand Crescent™ four-layer construction diagram
  1. CoolGuard™ Cover with ReVo™ Cool Gel

    Integrated cool gel technology provides instant cooling contact and superior temperature regulation. Zip-off for easy care.

  2. Vasco™60 Premium Memory Foam

    Premium-grade memory foam delivers exceptional pressure relief and superior body contouring with enhanced motion isolation.

  3. Laytec™ Responsive Support Layer

    Responsive support with faster recovery than traditional foam. Works with the Vasco™60 layer for optimal comfort balance and spinal alignment.

  4. Premium Foundation Layer

    Enhanced ventilation with exceptional stability and durability in a lightweight construction.

Why Choose Grand Crescent™?
Grand Crescent™ mattress showing premium comfort

The Grand Crescent™ brings together premium Vasco™60 memory foam and CoolGuard™ ReVo™ cool gel technology for the perfect balance of contouring comfort and temperature regulation.

Its four-layer construction pairs Laytec™ responsive support with ReVo™ cooling performance, delivering superior pressure relief with 30x better breathability than traditional memory foam — backed by a 5-year guarantee.

Ideal for:

  • Those seeking premium memory foam with cooling balance
  • Hot sleepers wanting contouring comfort without heat buildup
  • Anyone preferring responsive foam that bounces back quickly
  • Those requiring orthopaedic support with cooling comfort
Firmness & Depth Options

Firmness Levels

Medium

Premium memory foam comfort with cooling balance

Firm Orthopaedic

Therapeutic support with cooling gel technology

Available Depths

20 cm

Premium balance of memory foam and cooling technologies.

25 cm

Maximum comfort with full dual technology benefits.

Both depths available in Medium and Firm Orthopaedic. Suitable for a wide range of body weights.

Care & Maintenance

Mattress

  • No-flip design — one-sided use with a marked sleeping surface
  • Rotate head-to-foot periodically for even wear
  • Allow ventilation to maximise the 30x breathability

CoolGuard™ Cover

  • Professional dry clean only
  • Do not machine wash or hand wash
  • Do not use bleach or harsh chemicals
  • Do not tumble dry
Measuring Guide

We always recommend reducing your order size by a couple of centimetres to allow room for tucking in bedding, though this remains a personal preference.

Delivery
  • Free delivery to most addresses in England, Scotland, and Wales
  • Rolled and vacuum-packed in a 158 × 39 × 39 cm box for easy handling
  • Lead time typically 7–14 days depending on demand and production capacity

Specific mattress weights are available on request.

Frequently Asked Questions
How do memory foam and cooling gel work together?
Vasco™60 memory foam delivers contouring pressure relief whilst the CoolGuard™ ReVo™ cool gel regulates temperature — giving you the comfort of memory foam without the heat buildup.
What does dual technology performance mean?
Laytec™ provides responsive bounce back whilst ReVo™ delivers cooling performance — together they complement the Vasco™60 memory foam for a balanced sleep experience.
How long does a rolled mattress take to expand?
1–2 hours for basic expansion; allow 12–24 hours for full cooling and responsive performance activation.
What's included?
The mattress with CoolGuard™ zip-off cover, care instructions, and a 5-year guarantee.
Is the Firm Orthopaedic option suitable for everyday use?
Absolutely — it's designed for therapeutic support whilst maintaining cooling comfort for all sleeping positions.

5-Year GuaranteeQuality assured, built with confidence